[1]
A. Guszahari, U. Nuryanto, and Y. Handayani, “The Effect of Total Productive Maintenance and Reliability-Centered Maintenance on Operational Performance Through Overall Equipment Effectiveness of Power Plant at PT PLN Indonesia Power UBP PLTU Banten 1 Suralaya”, IIJSE, vol. 7, no. 3, pp. 8204-8225, Jan. 2025.