Analysis of Standard Time Determinationin Order to Increase U-Ditch Production Results at PT. The Charm of Arnos Beton Gresik

  • Imam Ramadhani Universitas Pembangunan Nasional Veteran Jawa Timur, Surabaya, Indonesia
  • Rusindiyanto Rusindiyanto Universitas Pembangunan Nasional Veteran Jawa Timur, Surabaya, Indonesia
Keywords: Production Targets, Standard Time, U-DITCH

Abstract

This study aims to determine the standard time required in one work cycle of U-DITCH concrete production so that it can meet and increase production targets and identify things that can be improved to increase operational efficiency and productivity. This study uses a work sampling method with calculations of cycle time, normal time, and standard time. Sampling of work using random numbers and field observations was carried out for 14 days. Based on the data processing that has been done, it can be seen that it is 73%, as well as a cycle time of 8.21 minutes/ Unit and normal time with an adjustment level of 1.5933 gets a time of 13.08 minutes/ Unit. The number of productive minutes is 5,518.8 minutes with the number of outputs that have been completed for 14 days of 672 Units. The standard time with a slack factor of 46% gets a result of 683.31 hours/ Unit and a standard output of 73 Units is obtained for 1 day.

Downloads

Download data is not yet available.

References

Anisa, H. N., & Prastawa, H. (2019). Analisis Beban Kerja Pegawai dengan Metode Full Time Equivalent (FTE) (Studi Kasus pada PT.PLN (Persero) Distribusi Jateng dan DIY). Jurnal Teknik Industri, 3(3), 1–8.

Firda Lutfia, C., & Syarif Hidayat, dan. (2018). Pengukuran Waktu Stasiun Kerja Perakitan Produk Meter Air… (Lutfia dan Hidayat) Pengukuran Waktu Stasiun Kerja Perakitan Produk Meter Air Dengan Metode Jam Henti Pada PT. Multi Instrumentasi. 160–165.

Montororing, Y. D. R. (2018). Usulan Penentuan Waktu Baku Proses Racking Produk Amplimesh dengan Metode Jam Henti Pada Departemen Power Coating. Jurnal Teknik, 7(2), 53–63.

Munte, S., Denny, A., Tanjung, S., & Penulis, M. (2023). Penerbit: LEMKOMINDO DESAIN PROSES PENGOLAHAN SERAT. https://penerbit.lemkomindo.org/

Panjaitan, R., Andriana, M., & Sumarlin, T. (2021). Sistem Informasi Manajemen Penentuan Standar Waktu Kerja Metode Time Study Berbasis Web (Studi Kasus PT Eka Sandang Duta Prima). EVOLUSI : Jurnal Sains Dan Manajemen, 9(2). https://doi.org/10.31294/evolusi.v9i2.11158

Ramadhani, A. S. (2020). Pengukuran waktu baku dan analisis beban kerja untuk menentukan jumlah optimal tenaga kerja pada proses cetak produk lipstick. Operations Excellence: Journal of Applied Industrial Engineering, 12(2), 177. https://doi.org/10.22441/oe.2020.v12.i2.004

Suradi. (2022). Sistem Produksi. In Cetakan Pertama, Yogyakarta; Graha Ilmu, (Vol. 1, Issue January).

Published
2024-08-29
How to Cite
Ramadhani, I., & Rusindiyanto, R. (2024). Analysis of Standard Time Determinationin Order to Increase U-Ditch Production Results at PT. The Charm of Arnos Beton Gresik. Indonesian Interdisciplinary Journal of Sharia Economics (IIJSE), 7(3), 6258-6274. https://doi.org/10.31538/iijse.v7i3.5353