Review of Subcontractor Selection Criteria in Construction Services Using Analytic Network Process (ANP) - Benefit Cost Risk (BCR)
Abstract
To develop effective techniques for selecting subcontractors, this research set out to determine which factors should take precedence and which alternatives may be useful in terms of BCR, benefits, costs, and risks. Based on the results Project managers, control managers, procurement bureau managers, production managers, finance bureau managers, and employees/staff directly related to procurement activities (i.e., procurement staff) were randomly selected to participate in in-depth interviews and questionnaires to gather data for the study of subcontractor selection criteria in construction services. Analytical Network Process (ANP) using BCR network structure methodology is used to analyze the data in this study. Benefit, Cost, and Risk (BCR) study of the subcontractor selection process yielded the following results: control criteria. As a result, the decision-making process for choosing subcontractors shifts its focus to other technical competency factors, which might provide advantages.
Downloads
References
Ascarya, A., & Yumanita, D. (2005). Mencari solusi rendahnya pembiayaan bagi hasil di perbankan syariah Indonesia. Bulletin of Monetary Economics and Banking, 8(1), 7–43.
BAPPENAS. (2016). SIARAN PERS: Mencapai Pertumbuhan Ekonomi 5,3% dengan Pengurangan TPT 5,3 – 5,6% dan Tingkat Kemiskinan 9,5 – 10,5% pada 2017. Kementerian Perencanaan Pembangunan Nasional/ Badan Perencanaan Pembangunan Nasional. https://bappenas.go.id/berita/siaran-pers-mencapai-pertumbuhan-ekonomi-53-dengan-pengurangan-tpt-53-56-dan-tingkat-kemiskinan-95-105-pada-2017
Ervianto, W. I. (2023). Manajemen proyek konstruksi (I). Penerbit Andi.
Fransisca, C., Universal, U., Vanomy, A. E., Universal, U., & Wave, T. K. (2024). Jurnal Bisnis dan Manajemen The Influence of the Korean Wave and the Hedonism Lifestyle on the Decision to Purchase Official / Unoffical Aespa Merchandise in Indonesian. 11(1), 53–62.
Fuady, M. (1998). Kontrak pemborongan mega proyek. Citra Aditya Bakti. https://books.google.co.id/books?id=zA_-AAAACAAJ
Gurpinar, G. dan. (2006). Analytic Network Process in Supplier Selection:A Case Study in An Electronic Firm. Science Direct. http://www.sciencedirect.com
Kurniawati, D., Yuliando, H., & Widodo, K. H. (2013). Kriteria Pemilihan Pemasok Menggunakan Analytical Network Process. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri, 15(1), 25–32.
Mahyuddin, Ritnawati, Fatmawaty Rachim, E., Mursalim, Adi Papa Pandarangga, Y. U., & Rustam Sidiq, A. R. (2023). Manajemen Proyek Konstruksi (1st ed., Issue August). Yayasan Kita Menulis.
Messah, Y. A., Pono, R. D. R., & Krisnayanti, D. S. (2009). T He S Tudy O F S Electing T He S Ubcontractor C Riteria B Y T He M Ain C Ontractors U Sing a Nalytic H Ierarchy P Rocess ( Ahp ) M Ethod K Ajian K Riteria P Emilihan S Ubkontraktor O Leh K Ontraktor U Tama M Enggunakan. 2008, 94–100.
Nugrohadi, I. A. W., Devi, A., & Rusydiana, A. S. (2015). Analisis Tinjauan dan Posisi Daya Saing Perikanan Kabupaten Natuna Melalui Pendekatan LQ (Location Quotient), SSA (Shift Share Analysis) dan RCA (Revealed Comparative Advantage). Jurnal Administrasi Dan Manajemen, 5(1).
Pandarangga, A., HA, R., & Dwi Hatmoko, J. U. (2015). KONSEPTUALISASI RANTAI PASOK PENYELENGGARAAN MATERIAL DAN PERALATAN KONSTRUKSI PADA INDUSTRI KONSTRUKSI DI INDONESIA. Doctor Program in Civil Engineering.
Puspitasari, N. B., & Yancadianti, K. H. (2016). Analisa Pemilihan Supplier Ramah Lingkungan Dengan Metode Analytical Network Process (Anp) Pada Pt Kimia Farma Plant Semarang. J@Ti Undip : Jurnal Teknik Industri, 11(1), 1–8. https://doi.org/10.12777/jati.11.1.1-8
Qomarudin, A., & Fitriyah, H. (2023). Implementasi Keberhasilan Sistem Manajemen Mutu Terpadu Hazard Analiysis and Critical Control Point Melalui Peningkatan Kompetensi Sumber Daya Manusia. Jurnal Bisnis and Manajemen, 10(1), 19–36. http://jurnal.unmer.ac.id/index.php/jbm
Rio Patria, L. Z., & Patria, R. (2017). Pemilihan Subkontraktor Pt X Dengan Metode Analytical Hierarchy Process. Bina Teknika, 12(1), 95. https://doi.org/10.54378/bt.v12i1.95
Saaty, T. L., & Peniwati, K. (2013). Group decision making: drawing out and reconciling differences. RWS publications.
Saaty, T. L., & Vargas, L. G. (2006). Decision making with the analytic network process (Vol. 282). Springer.
Saaty, T. L., Vargas, L. G., Saaty, T. L., & Vargas, L. G. (2013). The analytic network process. Springer.
Sujoko, A. (2019). Permasalahan Subkontrak Pada Pekerjaan Konstruksi di Pemerintah. Administrative Law and Governance Journal, 2(3), 416–418. https://doi.org/10.14710/alj.v2i3.413-435
Copyright (c) 2025 Susetyo Rohadi, Widi Hartono, Dewi Handayani, Andi Dwi Putranto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.