Lean Manufacturing Analysis with Waste Assessment Model (WAM) Approach to Reduce Critical Waste in the Production Process of Woven Sarong CV. XYZ

  • Raihan Rahmadianto Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, Indonesia
  • Joumil Aidil Saifuddin Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, Indonesia
Keywords: Lean Manufacturing, Production Efficiency, Waste Assessment Model, Waste Reduction, Woven Sarong

Abstract

The manufacturing industry faces challenges to improve efficiency and productivity amid increasingly fierce global competition. This study aims to analyze waste in the sarong weaving production process at CV. XYZ is using the Lean Manufacturing approach with the Waste Assessment Model (WAM) method. The results showed that the two most critical types of waste were transportation (20.95%) and inventory (20.64%). The root causes of transportation waste include inefficient fabric movement and narrow transportation lanes, while inventory waste is caused by the accumulation of goods in process (WIP) and the policy of purchasing raw materials in large quantities. The proposed improvements include layout optimization, efficient means of transportation, inventory management training, and line balancing implementation. The recommendations are projected to reduce production lead time by 13.60%, from 1,265 minutes to 1,093 minutes. This research makes a significant contribution to the application of Lean Manufacturing in the traditional textile industry.

Downloads

Download data is not yet available.

References

Arunizal, S., Wardhani, D. H., & Windarta, J. (2024). Penerapan Value Stream Mapping ( VSM ) untuk Menurunkan Lead Time Process dan Meningkatkan Kinerja Aktivitas Pengadaan di Site Tambang. 2(3), 141–150.

Dian, M. A., Nofirza, Silvia, Yola, M., & Devani, V. (2023). Analisis Lean Manufacturing Menggunakan Metode VSM dan WRM pada Lini Produksi Riau Jaya Paving. Jurnal Surya Teknika, 10(1), 574–583. https://doi.org/10.37859/jst.v10i1.4290

Eko Nurazizah, W., Yeyen Purnamasari, A., & Supriatno, B. (2023). Inovasi Model Problem Based Learning (PBL) Menggunakan Microsoft Teams Berbantu Fishbone Diagram. Jurnal Ilmiah Wahana Pendidikan, 9(15), 654–671. https://doi.org/10.5281/zenodo.8218325

Ernawati, N., Prajoko, U., Utomo, P., Juliani, C., & Zidan, M. (2024). Penerapan Lean Manufacturing Untuk Meminimalisir Waste Pada CV . Adelia Medika Supply. Jurnal Ilmiah Multidisi, 2(5), 780–788.

Fathimah, A. N., & Winarno, W. (2024). Penerapan Lean Manufacturing Menggunakan Value Stream Mapping pada VCT Rotor di PT. XYZ. Jurnal Teknik Industri Terintegrasi, 7(1), 590–598. https://doi.org/10.31004/jutin.v7i1.24788

Harsa, R., Sandi Suherman, Yola, M., Nur, M., & Harpito. (2024). Mereduksi Waste pada Konstruksi Pembangunan Fasilitas Gedung di Universitas Riau dengan Konsep Lean Construction Studi Kasus PT. Brantas Abipraya. Jurnal Manajemen Dan Teknik Industri-Produksi, XXIV, 197–208. https://doi.org/10.350587/Matrik

Ihsan, A. I., Novel, N. J. A., & Hidayatullah, A. P. (2023). Perancangan Material Information Flow Chart (MIFC) D26 Assembly Line Di PT XYZ. COMSERVA : Jurnal Penelitian Dan Pengabdian Masyarakat, 3(5), 1711–1718. https://doi.org/10.59141/comserva.v3i5.939

Istiqomah, P. S., Vidya Nandita, W., & Sayekti, N. P. (2023). Pengaruh Implementasi Konsep Just-in-Time terhadap Efisiensi Operasional dan Pengendalian Biaya di Perusahaan Manufaktur (Studi Kasus PT Waskita Karya Tbk). Pengaruh Implementasi Konsep Just-In-Time (Putri Silvia Istiqomah, Dkk) Madani: Jurnal Ilmiah Multidisiplin, 221(6), 221–230. https://doi.org/10.5281/zenodo.8117594

Naziihah, A., Arifin, J., & Nugraha, B. (2022). Identifikasi Waste Menggunakan Waste Assessment Model (WAM) di Warehouse Raw Material PT. XYZ. Jurnal Media Teknik Dan Sistem Industri, 6(1), 30. https://doi.org/10.35194/jmtsi.v6i1.1599

Novitasari, R., & Iftadi, I. (2021). Analisis Lean Manufacturing untuk Minimasi Waste pada Proses Door PU. Jurnal INTECH Teknik Industri Universitas Serang Raya, 6(1), 65–74. https://doi.org/10.30656/intech.v6i1.2045

Nurulita, S. (2024). Jurnal Logistics & Supply Chain ( LOGIC ) Analisis Penerapan Lean Warehouse untuk Minimasi Waste pada PT Pos Logistik Indonesia Jurnal Logistics & Supply Chain ( LOGIC ). Jurnal Logic, 03(01), 25–32.

Restuasih, S., Harjiyanto, K., & Juhri. (2024). Evaluasi Efisiensi Waste Komponen Rangka 450 Crs Dengan Metode Value Stream Mapping Di Pt Pltp. Techno-Socio Ekonomika, 17(1), 1–15. https://doi.org/10.32897/techno.2024.17.1.2857

Published
2025-05-12
How to Cite
Rahmadianto, R., & Saifuddin, J. (2025). Lean Manufacturing Analysis with Waste Assessment Model (WAM) Approach to Reduce Critical Waste in the Production Process of Woven Sarong CV. XYZ. Indonesian Interdisciplinary Journal of Sharia Economics (IIJSE), 8(2), 5650-5663. https://doi.org/10.31538/iijse.v8i2.6339