Identification of Waste Using Waste Assessment Model Method in the Application of Lean Manufacturing at PT. X

  • Fasha Husna Wicitra Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, Indonesia
  • Rus Indiyanto Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, Indonesia
Keywords: Waste, Waste Assessment Model, Lean Manufacturing

Abstract

PT X is a company that produces animal feed for poultry such as chickens, ducks, quails, and pigs. The animal feed products offered are in accordance with the nutritional needs of each growth period. The form of animal feed produced by PT X can be in the form of concentrates, mash, pellets or crumble. The challenge faced by PT X is that with the variety of products produced and the relatively large scale of production, the products produced often experience defects, so the products must be held in the warehouse for further processing. Forms of defects detected include abnormal texture, high moisture, and mixing. In addition, defects due to torn sacks also cause non -value-added activities because the products must be repackaged, resulting in delays in the delivery of orders for these products. The problem will be analyzed using the waste assessment model method to find critical waste, then a fishbone diagram is used to find the root of the problem and improvement proposals will be made using the 5W1H method. from the results of the calculation using the WAM method, the final results of the calculation using the Waste Assessment Model (WAM) method show that the highest waste in the animal feed production process is waste defects with a percentage value of 29.20%, waste inventory with a percentage of 19.63% and waste motion with a percentage of 13.20%. Then, improvement proposals will be given, including increasing operator training and evaluating the production process, implementing a digital-based monitoring system such as ERP / WMS for real-time stock visibility, adding conveyors or handlifts in the loading area to minimize manual load lifting movements to make it more effective. From the proposed improvements given, it can reduce the lead time by about 373.33 seconds or 6 minutes and 13 seconds.

Downloads

Download data is not yet available.

References

Afriandi, F., & Saifuddin, A., J. (2023). Penerapan Lean Manufacturing Menggunakan Metode Waste Assessment Model (WAM) Untuk Mengurangi Waste Pada Lini Produksi Steel Structure. Jurnal Teknik Mesin, Industri, Elektro dan Informatika (JTMEI), 2(4). https://doi.org/10.55606/jtmei.v2i4.1518 Buer, V.S., Semini, M., Strandhagen, O.J., & Sgarbossa, F. (2021). The complementary effect of lean manufacturing and digitalisation on operational performance. International Journal of Production Research. 59(07), 1976-1992. https://doi.org/10.1080/00207543.2020.1790684 Haekal, J. (2022). Integration Of Lean Manufacturing and Promodel Simulation on Repair Production Process Flow of Polysilane Bottle Printing Using VSM, WAM, VALSAT, And RCA Methods: Case Study Packaging Manufacturing Company. International Journal Of Scientific Advances, 3(2). 10.51542/ijscia.v3i2.15 Herlingga, M. (2021). Analisis Penerapan Lean Manufaktur Untuk Mengurangi Pemborosan Di Lantai Produksi PT. E Purwakarta Tahun 2021. Journal Of Industrial Management and Enterpreneurship JIME, 01(01), 98-105 Krisnanti, E.D., & Garside, A.K. (2022). Penerapan Lean Manufacturing untuk Meminimasi Waste Percetakan Box. Jurnal INTECH Teknik Industri Universitas Serang Raya, 8(2), 99108. https://doi.org/10.30656/intech.v8i2.4780 Nazihah, A., Arifin, J., & Nugraha, B. (2022). Identifikasi Waste Menggunakan Waste Assesment Model (WAM) di Warehouse Raw Material PT. XYZ. Jurnal Media Teknik Dan Sistem Industri, 6(1), 30-40.

Rahamneh, A., et al., (2023). The effect of digital supply chain on lean manufacturing: A structural equation modelling approach. Journal of Uncertain Supply Chain Management. 391-402. https://doi.org/ 10.5267/j.uscm.2022.9.003 Salsabila, I. R. (2021). Analisis Penerapan Konsep Lean Manufacturing Pada Proses Produksi Stainless Stell Coil Untuk Mereduksi Pemborosan (Waste) di PT. IMR ARC STEEL [Universitas Pembangunan Nasional “Veteran” Jawa Timur]. In repository.upnjatim.ac.id (Vol. 14, Issue 1). https://repository.upnjatim.ac.id/id/eprint/2346 Setiawan, I., & Rahman, A. (2021). Penerapan Lean Manufacturing Untuk Meminimalkan Waste Dengan Menggunakan Metode VSM Dan WAM Pada PT XYZ. Seminar Nasional Penelitian LPPM UMJ. http://jurnal.umj.ac.id/index.php/semnaslit

Published
2025-09-04
How to Cite
Wicitra, F., & Indiyanto, R. (2025). Identification of Waste Using Waste Assessment Model Method in the Application of Lean Manufacturing at PT. X. Indonesian Interdisciplinary Journal of Sharia Economics (IIJSE), 8(3), 10566-10579. https://doi.org/10.31538/iijse.v8i3.7238